ANALISA EFISIENSI WAKTU KERJA DAN BIAYA TERHADAP OPERASIONAL ALAT BERAT TOWER CRANE PADA PEKERJAAN PEMBANGUNAN STRUKTUR GEDUNG DPRD KOTA PADANG

  • Ado Manover Universitas Ekasakti Padang, Indonesia
  • Elviyanti Elviyanti Universitas Ekasakti Padang, Indonesia
  • Hafiz Maulana Universitas Ekasakti Padang, Indonesia
Keywords: Efisiensi Kerja, Tower Crane, Biaya Operasional

Abstract

In the use of heavy equipment sala one tower crane certainly incurs costs. The reason is the range or how long the use of heavy equipment is therefore strategic time planning is needed by the contractor in order to avoid the problem of vacant time on the tower crane, such as minor damage to the tower crane, operator discipline and readiness, miscommunication between the loader and receiver workers, and other things that can cause the tower crane to have empty time, not doing anything. The purpose or purpose of this analysis of the efficiency of working time and costs for the operation of tower cranes is to determine the efficiency of working time and costs on tower cranes, to find out the more efficient results of tower crane analysis and to find out the work efficiency and time sheet costs of tower cranes. The type of research is divided or classified into two types, the first is qualitative research and quantitative research. From the calculation of the working time efficiency of the tower crane without idling 83.33% with an operational cost of Rp. 27,882,082.5 / hour. The efficiency of tower crane working time due to idle decreased to 66.46% with an operating cost of Rp. 22,579,017.454 / hour. The time sheet of the tower crane machine is 100% with an operating cost of Rp. 33,458,499 / hour.

References

Abdelmegid, M.A, Shawki, K.M. and Khalek, H.A. 2015. GA Optimization Model for Solving Tower Crane Location Problem in Construction Sites. Alexandria Engineering Journal. Vol 54, Hal 519-526.

Ahmad, I.A. 2012. Analisis Produktivitas Dan Biaya Operasional Tower Crane Pada Proyek Puncak Central Business District Surabaya. Tugas Akhir. Universitas Negeri Surabaya.

Asiyanto. 2008. Manajemen Alat Berat Untuk Konstruksi. Penerbit PT. Pradnya Paramita. Jakarta.

Danutirto, D.T. 2019. Perbandingan Biaya Dan Produktivitas Tower Crane Antara Tipe Potain Fo/23b Dan Xcmg Fo/23b (Studi Kasus : Proyek Pembangunan Gedung Museum Muhammadiyah di Yogyakarta). Tugas Akhir. Universitas Islam Indonesia. Yogyakarta.

Fadhila, H., & Nursin, A. (2019). Analisis Waktu Siklus Tower Crane Pada Proyek South Side Apartment. In Prosiding Seminar Nasional Teknik Sipil (Vol. 1, No. 1, pp. 659-666). Diakses Harzing's Publish or Perish + www.google scholar.com

Handayani, E. (2017). Efisiensi Penggunaan Alat Berat Pada Pekerjaan Pembangunan TPA (Tempat Pemprosesan Akhir) Desa AMD Kec. Muara Bulian Kab. Batanghari. Jurnal Ilmiah Universitas Batanghari Jambi, Vol 15(3), Hal 90-95. Diakses Harzing's Publish or Perish + www.scopus.com

Janizar, S., & Abdullah, F. H. (2023). Efisiensi Waktu Dan Biaya Dalam Penggunaan Alat Berat Pada Pekerjaan Pemeliharaan Overlay Ruas Tol Cipularang Jalur A. Jurnal Teknik Sipil Cendekia (JTSC), 4(1), 450-463. Diakses Harzing's Publish or Perish + www.google scholar.com

Mahdiyah, N. N., & Lydianingtias, D. (2021). Perencanaan Penggunaan Tower Crane Untuk Pekerjaan Struktur Proyek Apartemen Bess Mansion Surabaya. Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK), Vol 2(3), Hal 202-209. Diakses Harzing's Publish or Perish + Crossref

Ridha, M. 2011. Perbandingan Biaya dan Waktu Pemakaian Alat Berat Tower crane dan Mobil Crane pada Proyek Rumah Sakit Haji Surabaya. Penelitian. (Tidak diterbitkan). Institute Teknologi Sepuluh November.

Rochmandi, (1990). Kapasitas dan Produksi Alat-Alat Berat, Dinas Pekerjaan Umum, Jakarta

Rostiyanti, S.F. 2002. Alat Berat Untuk Proyek Konstruksi. Jakarta: Rineka Cipta. Soeharto, I. 1997. Manajemen Proyek. Jakarta: Erlangga.

UNES, 2021. Buku Pedoman Penulisan Skripsi. Program Sarjana Teknik Sipil. Padang : Fakultas Teknik dan Perencanaan Universitas Ekasakti Padang.

Winanda, L.A.R. 2010.Evaluasi Penempatan Lokasi Group Tower Crane Terhadap Titik Layanan. Malang: Institut Teknologi Nasional Malang.

Published
2024-01-30
How to Cite
Manover, A., Elviyanti, E., & Maulana, H. (2024). ANALISA EFISIENSI WAKTU KERJA DAN BIAYA TERHADAP OPERASIONAL ALAT BERAT TOWER CRANE PADA PEKERJAAN PEMBANGUNAN STRUKTUR GEDUNG DPRD KOTA PADANG. Journal of Applied Engineering Scienties, 7(1), 9-18. Retrieved from https://ojs-ft.ekasakti.org/index.php/JAES/article/view/119